FIFA World Cup Brazil 2014™ and FIFA Confederations Cup Brazil 2013™

FIFA World Cup Brazil 2014™ and FIFA Confederations Cup Brazil 2013™

2013 | 2014

Brazil

  • Technical Consultancy
  • Design Review
  • Stadium Construction Monitoring
  • Overlay Management Solution

Selected by the Local Organising Committee and FIFA as the technical Engineering and Architecture Department, we supported the FIFA World Cup 2014 and FIFA Confederations Cup 2013 in Brazil across all 12 stadiums in 12 host cities. Our work spanned design review, on-site stadium construction monitoring and a complete overlay management solution, covering 3.9 million sqm of built area and 3.5 million sqm of overlay designed areas. A team of more than 30 architects within a 50-person team guaranteed delivery in full compliance with FIFA requirements and operational standards.

12 stadiums, 12 host cities, one World Cup delivered

Technical Consultancy & Design Review

Technical Consultancy & Design Review

We guaranteed the design delivery of all 12 FIFA World Cup stadiums in compliance with all FIFA requirements and operational standards.

We were selected by the Local Organising Committee and FIFA as the technical Engineering and Architecture Department during the planning and operational phases.

The scope included guiding and consulting with stadium architects to comply with event requirements, as well as supporting FIFA and the LOC across all infrastructure and design compliance activities for FIFA World Cup 2014 and FIFA Confederations Cup 2013.

Stadium Construction Monitoring

Stadium Construction Monitoring

We were present on-site at all 12 stadiums from the beginning of the construction period. Our inputs were vital to speed up decisions and create a smooth connection between site routine and event demands, while keeping FIFA Board Meetings updated with a clear picture of stadium delivery progress. Scope included FIFA World Cup 2014 and FIFA Confederations Cup 2013 stadiums.

Overlay Management Solution

Overlay Management Solution

We guaranteed the overlay delivery of the FIFA World Cup in compliance with all FIFA requirements and operational standards.

We built a complete and comprehensive overlay procurement model, compiling detailed technical documentation including drawings and BOQs, and guiding the full process across the 12 host cities. After contractors were appointed, we also managed all suppliers on-site, monitoring schedules and technical compliance. The scope included overlay planning and delivery for FIFA World Cup 2014 and FIFA Confederations Cup 2013.